Advanced Technologies for Enhanced Air Safety


Development Overview

Incheon Airport is developing for the MRO Cluster. Investors/operators are allowed to build large-scale integrated facilities such as hagars, engine cells, and component shops in 1.6milllion㎡ Design and construction of investor's facilities are available to be proceeded at the same time

Category Details
Site Area 1,643,913 ㎡
Facilities Hangars(Facilities for Airplane maintenance), Engine/part mainatenance facilities
Moving-in Period 2023~

Promising Business Sectors

Category Details
① Airframe Transit Check, Line Check(A), Heavy Check(C,D), Painting, Conversion for Narrow and Wide body Aircrafts
② Engine Engine On-wing-support, Repair, and Overhaul
③ Component Life-cycle Support for All Major Components such as Wheels & Brakers, APU, IFE, Landing Gear, Furnishings, Thrust Reverser, Flight Controls, Hydraulic
④ Parts SCM Aircraft Parts SCM Solutions(pooling, lease, etc.)
⑤ Education / Training Education and Training Programs certified by FAA, EASA

Lease Options

• Tenants can choose the way of Lease in line with your business plan
Category Land Lease Land Lease
Role & Responsibility (IIAC) Land Lease
(Tenant) Build Facilities
(IIAC) Land + Facilities Lease
(Tenant) Interior, tool, equipment
* IIAC build the facilities to suit the needs of Tenant
Contract Period Maximum50 years
Lease Fee The Official Land Value of the year x Rental Rate(%) To be negotiated according to the lease conditions
* Contract Period and Lease Fee may differ depending on negotiation outcomes

The Existing Facilities

• Total Size : 469,000 ㎡
• Maintemance Capabilities : Line/heavy Maintenance, Engine Change and part repair

Company Hanger Detail
Korean Air A · Facility : W/B 2.5 Bay
· Land Size : 70,368 ㎡
Asiana Airline B · Facility : W/B 1 Bay
· Land Size : 33,060㎡
B-1 · Facility : W/B 2.5 Bay
· Land Size : 62,060 ㎡
Sharp Techniques K C · Facility : N/B 2 Bay
· Land Size : 28,246 ㎡

Contact

Department : Aviation Facilities Development Team
TEL : 032-741-2261